Project: EaglesWing   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Todd Luebstorf   -  
Project:   Zenith CH750SD   -   VIEW REPORTS
Total Hours:496.7
Total Flight Time:
Start/Last Date:Dec 12, 2019 - No Finish Date
Engine:Viking 195
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=EaglesWing

Home or Last Project Picture

Nov 10, 2020     Primed and drilled holes - (6.5 hours)       Category: Tail
Primed the elevator tip ribs, elevator hinge angles, and the elevator outboard hinge pins. Started to cleco the stabilizer pieces together and realized that a lot of holes were not drilled to final size. Worked on drilling everything to final size and debured the holes.


 